In early July Lysander co-ordinated the move of 60 pieces of break bulk cargo and 12 x SOC from Arzew, Algeria to Al Jubail, Saudi Arabia. The cargo totalling over 845,000 kgs and 4,162 cbm of cranes and construction equipment. To move the cargo...
read moreLysander Shipping successfully shipped 2 x Mating Rings from Bilbao to Busan. Chartering a coaster vessel from Bilbao to Antwerp were it was transhipped to meet the mother vessel for it final voyage to Busan. The Cargo was 8.67m diameter x 1.22m...
read moreIn November Lysander arranged a shipment for Hyundai Heavy Industri from Bilbao to Balboa in Panama. Amongh the parts for the powerplant was turbine of over 86 MT in weight.
read moreIn December 2012, Lysander Shipping arranged the shipment of Waste Heat Recovery Units from the UK factory to Busan Port. The shipment included four 5m wide x 8m high units and a number of smaller items, totalling approximately 1300cbm....
read moreRecently Lysander Shipping arranged for shipment of 2300 MT of steel structures from Antwerp to Burntisland in Scoland. The cargo was manufactured in South Korea and the units will be used by BIFAB in the...
read more