04.09.2015

Precious Machine from Trieste to South Korea

During August Lysander arranged the shipment of a large Wartisla engine block machine from Trieste to South Korea. The machine weighing 240 tons was dismantled and shipped using 7x 40’HC, 12 x40’OT, 5x40’FR and 5 pieces as break bulk on board the CMACGM vessel Xin Da Lian.