Lysander UK and Denmark arranged the shipment of a generator and turbine for a gas plant, totalling 1200cbm from the factory in Le Creusot to the French port of Fos for loading onto the vessel destination for Mostaganem in Algeria. One piece 4.2m wide and 4 m high which required special trucking permit and road closures to reach the port.