10.01.2017

GENERATOR FOR TURKEY

Lysander Shipping London arranged for a 22 mt generator to be replaced in a Turkish windmill.
 
With the old generator broken and Lysander Shipping arranged the transport from Korea to the site in the Turkish mountains for the replacement. A 500 MT crane was positioned to replace the unit at a height of 68 m, the load was carefully co-ordinated by a windmill lifting engineer contracted in by Lysander Shipping.